“I announced that four sets of 105000Nm3/h air separation units for the second phase of the 40 million tons/year refining and chemical integration project of Zhejiang Petrochemical will be won by Hangyang.” In a round of applause, Chairman Jiang Ming and Director of Zhejiang Petrochemical Co., Ltd. Long Li Shuirong clasped his hands together, and the two sides joined hands again to make a key development project for the National Development and Reform Commission, and to build a new landmark in Zhejiang Province on the coast of the East China Sea. On September 27, 2018, Premier Li Keqiang came to the site of the Zhejiang Petrochemical Project to inspect this world-class large-scale integrated petrochemical industry project. The arrival of the Prime Minister has greatly promoted the pace of the progress of the second phase of the Zhejiang Petrochemical Project, and also encouraged the Hangyang people to win the confidence and determination of the project. Before the Spring Festival, the heads of the two companies met again at the Zhoushan Yushan Island Zhejiang Petrochemical Project Headquarters to summarize and exchange the cooperation of the first phase of the project, and the final communication and negotiation on the second phase of the project cooperation and business contract. “Thank you for the efforts and efforts made by Hangyang for the first-phase air separation project of Zhejiang Petrochemical Co., Ltd., especially the implementation team and service team of Hangyang Air Separation Project. The meticulous service and control over the progress of the project left a deep impression on me. Impression!” At the 40 million tons/year refining and chemical integration project meeting of Zhejiang Petrochemical, Li Shuirong, the chairman of Zhejiang Petrochemical Co., Ltd., gave a high degree of recognition to Hangyang’s work in the first phase of the project. With the good foundation laid in the first phase of the project and the large amount of program price demonstration in the early stage of the project team, the two parties reached a consensus on the second phase of the project cooperation under the witness of the project technical business team. In the first phase of Zhejiang Petrochemical project manufacturing, the company strictly implemented the quality engineering project according to the requirements of Zhejiang manufacturing standards, and fully considered the characteristics of this island-based project, and innovatively proposed the concept of “infinity factory”, which will be a cold box. The production and manufacturing has expanded to the “dock factory”, which avoids interference from external factors and facilitates the transportation of products, greatly improving work efficiency. The party committee also attached great importance to the work of the project. In order to ensure the high-quality completion of the project as scheduled, the “Zhejiang Petrochemical Air Separation Project Temporary Party Branch” was established, and the “Red Engine” injected inexhaustible power into the project. During the installation phase of the project, the on-site personnel overcame the difficult working conditions on the island. In order to ensure that the overall cold box arrives in advance, the long-term on-site site will solve the problems in the installation process. Under the company’s multi-faceted and strong sense of responsibility, the progress of the project was completed on schedule and was highly recognized by users of Zhejiang Petrochemical. The signing of this contract once again proved the strength of “Hangzhou Oxygen Manufacturing”. The relevant leaders of the company stated that the second-phase air separation project has strict requirements on delivery time and higher requirements for advanced equipment and stability. We must find ways to improve and strive to make the Zhejiang Petrochemical project a “high quality” and “high standard” quality project.